The „Stolmen” house is a two-story building with a total usable area of as much as 119.1 m2, ideal for a large family. On the ground floor, with an area of just under 70 m2, you will find, among other things, a bathroom and an open kitchen combined with a dining room and a spacious, bright living room, from which you can go directly out onto a large L-shaped terrace.

On the first floor, there are three bedrooms/bedrooms and a bathroom. From the corridor on the first floor, you can access the large terrace located directly above the living room.


SELECTED DETAILS

86,6 m2

Build-up area

130 m2

Gross floor area

7,0 m

Height of a building

3

Number of bedrooms

Ground floor 69,8 m2

  • vestibule  – 3,6 m2
  • living room – 29,0 m2
  • dining room / passageway – 17,5 m2
  • utility room / boiler room – 4,2 m2
  • kitchen – 9,9 m2
  • bathroom – 5,6 m2

The second floor35,3 m2

  • corridor – 6,1 m2
  • bathroom – 7,4 m2
  • bedroom – 12,4 m2
  • room – 9,4 m2

GALLERY

FINISHING STANDARD

RAW STATE

  • Architectural concept
  • Technical design documentation
  • CLT timber residential modules
  • Fasteners and straps required to install modules on site
  • Exterior window and door joinery
  • Securing the modules for transport
  • Set of installation instructions

DEVELOPER STATE

Raw state Equipment+

  • Finishing layers on the floor – thermal and acoustic insulation, dry screed
  • Finishing of the walls and ceiling with new plaster-boards without mudding according to the project
  • Finishing of the bathroom with plaster- boards without mudding
  • WC flush-mounted installation system
  • Internal electrical and teletechnical installations
  • Smart Home system + Grenton touch panels for self-assembly
  • Electrical switchboard
  • Internal plumbing
  • Mechanical ventilation with recuperation
  • Recuperator
  • Water underfloor heating
  • Boiler room equipment – buffer tank, hydraulic tower
  • Air-to-water heat pump

TURNKEY STATE

Developer state equipment+

  • Floor panels and skirting boards
  • Mudding + painting of plasterboard ceiling walls
  • Tiles on the floor of the boiler room
  • Complete bathroom – waterproofing, tiles and white-ware installation
  • Tiles over the countertop in the kitchen
  • Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
  • Sink and faucet in the kitchen
  • Sockets and switches
  • Installation of Smart Home touch panels
  • Interior lighting fixtures (excluding stan- ding and desk lamps)
  • Upholstered panels + decorative moldings behind the bed in the bedroom
  • Wooden interior doors
  • Interior glass doors (in the vestibule)
ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK
  • Purchase of land
  • Macro-levelling of land plot
  • Development of land plot
  • Establishment of connections and networks on the plot of land
  • Earthworks
  • Laying of foundation
  • Execution of terrace/pergola at ground level
  • Execution of pergola on the roof terrace
  • Delivery of mobile furniture
  • Costs of projects, agreements, decisions, etc. other than those mentioned above mentioned above