SYNDIN

Syndin is a family-oriented house designed with comfort in mind. It features three bedrooms and a spacious, brightliving room. Each resident will find their own corner in the house. The usable area of the house is 98m2.

Optionally, one of the bedrooms can be converted into an additional large bathroom.

The house is both minimalist and modern. Like every house in our offer, it is an excellent choice for those who value eco-friendly solutions and a high level of comfort.

The well-utilized space of the house provides plenty of storage space. The living room is filled with natural light, thanks to the windows that also serve as an exit to the outside.


SELECTED DETAILS

119,0 m2

Build-up area

119,0 m2

Gross floor area

3,9 m

Height of a building

2

Number of bedrooms

Ground floor 98,6 m2

  • vestibule  – 3,6 m2
  • room – 9,1 m2
  • room – 9,1 m2
  • bedroom – 14,0 m2
  • living room / dining room – 43,2 m2
  • utility room / boiler room – 4,2 m2
  • kitchen – 9,9 m2
  • bathroom – 5,5 m2

GALLERY

FINISHING STANDARD

RAW STATE

  • Architectural concept
  • Technical design documentation
  • CLT timber residential modules
  • Fasteners and straps required to install modules on site
  • Exterior window and door joinery
  • Securing the modules for transport
  • Set of installation instructions

DEVELOPER STATE

Raw state Equipment+

  • Finishing layers on the floor – thermal and acoustic insulation, dry screed
  • Finishing of the walls and ceiling with new plaster-boards without mudding according to the project
  • Finishing of the bathroom with plaster- boards without mudding
  • WC flush-mounted installation system
  • Internal electrical and teletechnical installations
  • Smart Home system + Grenton touch panels for self-assembly
  • Electrical switchboard
  • Internal plumbing
  • Mechanical ventilation with recuperation
  • Recuperator
  • Water underfloor heating
  • Boiler room equipment – buffer tank, hydraulic tower
  • Air-to-water heat pump

TURNKEY STATE

Developer state equipment+

  • Floor panels and skirting boards
  • Mudding + painting of plasterboard ceiling walls
  • Tiles on the floor of the boiler room
  • Complete bathroom – waterproofing, tiles and white-ware installation
  • Tiles over the countertop in the kitchen
  • Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
  • Sink and faucet in the kitchen
  • Sockets and switches
  • Installation of Smart Home touch panels
  • Interior lighting fixtures (excluding stan- ding and desk lamps)
  • Upholstered panels + decorative moldings behind the bed in the bedroom
  • Wooden interior doors
  • Interior glass doors (in the vestibule)
ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK
  • Purchase of land
  • Macro-levelling of land plot
  • Development of land plot
  • Establishment of connections and networks on the plot of land
  • Earthworks
  • Laying of foundation
  • Execution of terrace/pergola at ground level
  • Execution of pergola on the roof terrace
  • Delivery of mobile furniture
  • Costs of projects, agreements, decisions, etc. other than those mentioned above mentioned above
Back