TORP

The „Torp” house is a space that is ideal even for a family of 2+3, and the 91.9 m2 of usable space consists of two floors. On the ground floor, you will find, among other things, a bathroom, a bedroom, a kitchen with a dining area, and a living room from which you can access the terrace directly. On the first floor, on the other hand, there are two rooms and a bathroom. From one of the rooms, the largest on the first floor, we can access the terrace.


SELECTED DETAILS

69,7 m2

Build-up area

119,4 m2

Gross floor area

7,0 m

Height of a building

2

Number of bedrooms

Ground floor 55,5 m2

  • vestibule  – 2,5 m2
  • corridor – 1,9 m2
  • bathroom – 4,2 m2
  • bedroom – 9,7 m2
  • passageway – 4,9 m2
  • living room – 14,1 m2
  • utility room / boiler room – 6,8 m2
  • kitchen / dining room – 11,1 m2

The second floor36,4 m2

  • corridor – 8,0 m2
  • bathroom – 5,5 m2
  • room – 9,7 m2
  • bedroom – 13,00 m2

GALLERY

FINISHING STANDARD

RAW STATE

  • Architectural concept
  • Technical design documentation
  • CLT timber residential modules
  • Fasteners and straps required to install modules on site
  • Exterior window and door joinery
  • Securing the modules for transport
  • Set of installation instructions

DEVELOPER STATE

Raw state Equipment+

  • Finishing layers on the floor – thermal and acoustic insulation, dry screed
  • Finishing of the walls and ceiling with new plaster-boards without mudding according to the project
  • Finishing of the bathroom with plaster- boards without mudding
  • WC flush-mounted installation system
  • Internal electrical and teletechnical installations
  • Smart Home system + Grenton touch panels for self-assembly
  • Electrical switchboard
  • Internal plumbing
  • Mechanical ventilation with recuperation
  • Recuperator
  • Water underfloor heating
  • Boiler room equipment – buffer tank, hydraulic tower
  • Air-to-water heat pump

TURNKEY STATE

Developer state equipment+

  • Floor panels and skirting boards
  • Mudding + painting of plasterboard ceiling walls
  • Tiles on the floor of the boiler room
  • Complete bathroom – waterproofing, tiles and white-ware installation
  • Tiles over the countertop in the kitchen
  • Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
  • Sink and faucet in the kitchen
  • Sockets and switches
  • Installation of Smart Home touch panels
  • Interior lighting fixtures (excluding stan- ding and desk lamps)
  • Upholstered panels + decorative moldings behind the bed in the bedroom
  • Wooden interior doors
  • Interior glass doors (in the vestibule)
ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK
  • Purchase of land
  • Macro-levelling of land plot
  • Development of land plot
  • Establishment of connections and networks on the plot of land
  • Earthworks
  • Laying of foundation
  • Execution of terrace/pergola at ground level
  • Execution of pergola on the roof terrace
  • Delivery of mobile furniture
  • Costs of projects, agreements, decisions, etc. other than those mentioned above mentioned above
Back