TORP
The „Torp” house is a space that is ideal even for a family of 2+3, and the 91.9 m2 of usable space consists of two floors. On the ground floor, you will find, among other things, a bathroom, a bedroom, a kitchen with a dining area, and a living room from which you can access the terrace directly. On the first floor, on the other hand, there are two rooms and a bathroom. From one of the rooms, the largest on the first floor, we can access the terrace.
SELECTED DETAILS
69,7 m2
Build-up area
119,4 m2
Gross floor area
7,0 m
Height of a building
2
Number of bedrooms
Ground floor – 55,5 m2
- vestibule – 2,5 m2
- corridor – 1,9 m2
- bathroom – 4,2 m2
- bedroom – 9,7 m2
- passageway – 4,9 m2
- living room – 14,1 m2
- utility room / boiler room – 6,8 m2
- kitchen / dining room – 11,1 m2
The second floor – 36,4 m2
- corridor – 8,0 m2
- bathroom – 5,5 m2
- room – 9,7 m2
- bedroom – 13,00 m2
GALLERY
FINISHING STANDARD
RAW STATE
- Architectural concept
- Technical design documentation
- CLT timber residential modules
- Fasteners and straps required to install modules on site
- Exterior window and door joinery
- Securing the modules for transport
- Set of installation instructions
DEVELOPER STATE
Raw state Equipment+
- Finishing layers on the floor – thermal and acoustic insulation, dry screed
- Finishing of the walls and ceiling with new plaster-boards without mudding according to the project
- Finishing of the bathroom with plaster- boards without mudding
- WC flush-mounted installation system
- Internal electrical and teletechnical installations
- Smart Home system + Grenton touch panels for self-assembly
- Electrical switchboard
- Internal plumbing
- Mechanical ventilation with recuperation
- Recuperator
- Water underfloor heating
- Boiler room equipment – buffer tank, hydraulic tower
- Air-to-water heat pump
TURNKEY STATE
Developer state equipment+
- Floor panels and skirting boards
- Mudding + painting of plasterboard ceiling walls
- Tiles on the floor of the boiler room
- Complete bathroom – waterproofing, tiles and white-ware installation
- Tiles over the countertop in the kitchen
- Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
- Sink and faucet in the kitchen
- Sockets and switches
- Installation of Smart Home touch panels
- Interior lighting fixtures (excluding stan- ding and desk lamps)
- Upholstered panels + decorative moldings behind the bed in the bedroom
- Wooden interior doors
- Interior glass doors (in the vestibule)
ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK
- Purchase of land
- Macro-levelling of land plot
- Development of land plot
- Establishment of connections and networks on the plot of land
- Earthworks
- Laying of foundation
- Execution of terrace/pergola at ground level
- Execution of pergola on the roof terrace
- Delivery of mobile furniture
- Costs of projects, agreements, decisions, etc. other than those mentioned above mentioned above