VINJE
The „Vinje” house is a proposal for families looking for a comfortable space for each household member. In its simple but modern form, it offers 90.6 m2 of usable space, which is divided into two floors.
On the ground floor, with a floor area of 54.7 m2, we find, among others, bedrooms, a bathroom, an open kitchen with a dining area, and a living room from which we can go out directly onto a large terrace.
On the first floor, with a floor area of 35.9 m2, we find a bathroom and two rooms/ bedrooms, and from the corridor, we can access the terrace.
SELECTED DETAILS
69,7 m2
Build-up area
119,4 m2
Gross floor area
7,0 m
Height of a building
2
Number of bedrooms
Ground floor – 54,5 m2
- vestibule – 3,8 m2
- living room – 9,9 m2
- kitchen / dining room – 16,1 m2
- utility room / boiler room – 6,7 m2
- passageway – 5,3 m2
- bedroom – 8,8 m2
- bathroom – 4,0 m2
The second floor – 24,6 m2
- corridor – 9,1 m2
- bedroom – 13,9 m2
- room – 8,9 m2
- bathroom – 4,0 m2
GALLERY
FINISHING STANDARD
RAW STATE
- Architectural concept
- Technical design documentation
- CLT timber residential modules
- Fasteners and straps required to install modules on site
- Exterior window and door joinery
- Securing the modules for transport
- Set of installation instructions
DEVELOPER STATE
Raw state Equipment+
- Finishing layers on the floor – thermal and acoustic insulation, dry screed
- Finishing of the walls and ceiling with new plaster-boards without mudding according to the project
- Finishing of the bathroom with plaster- boards without mudding
- WC flush-mounted installation system
- Internal electrical and teletechnical installations
- Smart Home system + Grenton touch panels for self-assembly
- Electrical switchboard
- Internal plumbing
- Mechanical ventilation with recuperation
- Recuperator
- Water underfloor heating
- Boiler room equipment – buffer tank, hydraulic tower
- Air-to-water heat pump
TURNKEY STATE
Developer state equipment+
- Floor panels and skirting boards
- Mudding + painting of plasterboard ceiling walls
- Tiles on the floor of the boiler room
- Complete bathroom – waterproofing, tiles and white-ware installation
- Tiles over the countertop in the kitchen
- Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
- Sink and faucet in the kitchen
- Sockets and switches
- Installation of Smart Home touch panels
- Interior lighting fixtures (excluding stan- ding and desk lamps)
- Upholstered panels + decorative moldings behind the bed in the bedroom
- Wooden interior doors
- Interior glass doors (in the vestibule)
ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK
- Purchase of land
- Macro-levelling of land plot
- Development of land plot
- Establishment of connections and networks on the plot of land
- Earthworks
- Laying of foundation
- Execution of terrace/pergola at ground level
- Execution of pergola on the roof terrace
- Delivery of mobile furniture
- Costs of projects, agreements, decisions, etc. other than those mentioned above mentioned above