VINJE

The „Vinje” house is a proposal for families looking for a comfortable space for each household member. In its simple but modern form, it offers 90.6 m2 of usable space, which is divided into two floors.

On the ground floor, with a floor area of 54.7 m2, we find, among others, bedrooms, a bathroom, an open kitchen with a dining area, and a living room from which we can go out directly onto a large terrace.

On the first floor, with a floor area of 35.9 m2, we find a bathroom and two rooms/ bedrooms, and from the corridor, we can access the terrace.


SELECTED DETAILS

69,7 m2

Build-up area

119,4 m2

Gross floor area

7,0 m

Height of a building

2

Number of bedrooms

Ground floor 54,5 m2

  • vestibule  – 3,8 m2
  • living room – 9,9 m2
  • kitchen / dining room – 16,1 m2
  • utility room / boiler room – 6,7 m2
  • passageway – 5,3 m2
  • bedroom – 8,8 m2
  • bathroom – 4,0 m2

The second floor24,6 m2

  • corridor – 9,1 m2
  • bedroom – 13,9 m2
  • room – 8,9 m2
  • bathroom – 4,0 m2

GALLERY

FINISHING STANDARD

RAW STATE

  • Architectural concept
  • Technical design documentation
  • CLT timber residential modules
  • Fasteners and straps required to install modules on site
  • Exterior window and door joinery
  • Securing the modules for transport
  • Set of installation instructions

DEVELOPER STATE

Raw state Equipment+

  • Finishing layers on the floor – thermal and acoustic insulation, dry screed
  • Finishing of the walls and ceiling with new plaster-boards without mudding according to the project
  • Finishing of the bathroom with plaster- boards without mudding
  • WC flush-mounted installation system
  • Internal electrical and teletechnical installations
  • Smart Home system + Grenton touch panels for self-assembly
  • Electrical switchboard
  • Internal plumbing
  • Mechanical ventilation with recuperation
  • Recuperator
  • Water underfloor heating
  • Boiler room equipment – buffer tank, hydraulic tower
  • Air-to-water heat pump

TURNKEY STATE

Developer state equipment+

  • Floor panels and skirting boards
  • Mudding + painting of plasterboard ceiling walls
  • Tiles on the floor of the boiler room
  • Complete bathroom – waterproofing, tiles and white-ware installation
  • Tiles over the countertop in the kitchen
  • Fixed furniture (closet in the vestibule, closet in the bedroom, kitchen furniture, cabinet under the sink in the bathroom)
  • Sink and faucet in the kitchen
  • Sockets and switches
  • Installation of Smart Home touch panels
  • Interior lighting fixtures (excluding stan- ding and desk lamps)
  • Upholstered panels + decorative moldings behind the bed in the bedroom
  • Wooden interior doors
  • Interior glass doors (in the vestibule)
ELEMENTS NOT INCLUDED IN THE SCOPE OF WORK
  • Purchase of land
  • Macro-levelling of land plot
  • Development of land plot
  • Establishment of connections and networks on the plot of land
  • Earthworks
  • Laying of foundation
  • Execution of terrace/pergola at ground level
  • Execution of pergola on the roof terrace
  • Delivery of mobile furniture
  • Costs of projects, agreements, decisions, etc. other than those mentioned above mentioned above